PDP Construction

Build to suit, or lease an existing building?

When none of our buildings fit, PDP Construction alters one of ours or builds new premises to your brief, and you lease it from us. Here's how it works, and how to decide.

How a build or alteration works with PDP

  1. Your brief

    Tell us the floor area, power, door heights, floor loading, offices, ablutions, yard and when you need to move in.

  2. The building or site

    We look at our own buildings first. If none can be adapted, we look for a property we can buy.

  3. Agree it in writing

    We agree the scope, timing and cost with you, and write them into the lease before any work starts.

  4. Build or alter

    PDP Construction does the work on our building, to the agreed brief.

  5. Move in

    The space is ready for your business on the day you move in, and you lease it directly from us.

Build to suit, or lease an existing building?

Lease an existing buildingBuild or alter to suit
Time to move inUsually sooner, if a building fitsLonger: depends on the work and any approvals
FitYou adapt to the buildingMade to your brief
CostRent reflects the building as it isThe cost of the work is built into the lease terms we agree
CommitmentCan suit shorter leasesUsually suits a longer lease

Often the answer is in between: one of our existing buildings, altered to suit. We'll tell you plainly which route fits your timing and budget.

What we can change

  • Power supply upgrades
  • New or larger roller doors
  • Offices and mezzanines
  • Ablutions and staff kitchens
  • Yard, parking and truck access
  • Layout and partitioning
Illustration: steel portal frame of an industrial building under construction
Illustration. PDP Construction builds new premises and alters our buildings to match each tenant's requirements.

Talk to the owner

Call or WhatsApp us, or send an enquiry. You'll speak to the people who own the buildings.